---

Saturday, March 12, 2016




After the winter of last year this winter as been a blessing.  I am sure there are countless backs and shovels breathing a sigh of relief.


The only way this winter was hard was a loss of a close dear friend Steve Rosa from Rosemont Engineering   The fire pump controller industry will not be the same without him.  I know Rick, Eric and Mary at Rosemont have their work cut out for them with such big shoes to fill. He was never thought of as a work colleague but as family.


On a lighter note, spring is right around the corner and the Fire Pump Testing Schedule for 2016 is starting to fill up.  If you have any testing you would like to complete prior to the summer feel free to reach out to me so we can get you on the schedule.

Thank you for keeping R.D.Bartels Pump in mind for your Fire Pump System Testing, Repair and Commissioning.  All Annual Testing performed to NFPA25 and All New Installations performed to NFPA20.

If you have previous test reports with questions or concerns from R.D.Bartels Pump or from outside of myself you can forward them over and I will be more than able to review them with you.

And remember to run your fire pump per NFPA 25 between your annual testing.

No comments:

Post a Comment